¹Ýµð¾Ø·ç´Ï½º ÀÎÅͳݼ­Á¡

³×ºñ°ÔÀÌ¼Ç ½Ç½Ã°£ Àαâ Ã¥

    Ç÷£Æ® ¹è°ü ¼³°è

    Ç÷£Æ® ¹è°ü ¼³°è

    • ¹Úö¼ö.±èº´½Ä.°øÁø¼º Àú
    • ¹Ú¿µ»ç(ÁÖ)
    • 2021³â 08¿ù 19ÀÏ
    • Á¤°¡
      32,000¿ø
    • ÆǸŰ¡
      32,000¿ø [0% ÇÒÀÎ]
    • °áÁ¦ ÇýÅÃ
      ¹«ÀÌÀÚ
    • Àû¸³±Ý
      0¿ø Àû¸³ [0%P]

      NAVER Pay °áÁ¦ ½Ã ³×À̹öÆäÀÌ Æ÷ÀÎÆ® 5% Àû¸³ ?

    ÆǸŰ¡ Á¾·áµÈ »óÇ°ÀÔ´Ï´Ù.

    ȸ¿ø¸®ºä
    - [0]
    ISBN: 9791130311968 448ÂÊ 1,210g »çÀÌÁî Á¤º¸ ÁغñÁß

    Áö±Ý ÀÌÃ¥Àº

    • ÆǸÅÁö¼ö : 0

    ÀÌ ºÐ¾ßÀÇ º£½ºÆ®¼¿·¯

    ¤ýÇ°ÀýµÈ »óÇ°ÀÔ´Ï´Ù.

    ÀÌ Ã¥ÀÌ ¼ÓÇÑ ºÐ¾ß

    ÀúÀÚ ¼Ò°³

    ¹Úö¼ö.±èº´½Ä.°øÁø¼º

    ÀúÀÚ : ¹Úö¼ö
    Çö Sv Plant Engineering ´ëÇ¥
    »ï¼º¿£Áö´Ï¾î¸µ(ÁÖ), SK°Ç¼³(ÁÖ), ´ë¿ìÁ¶¼±(ÁÖ) µî¿¡¼­ 34³â ±Ù¹«
    ¼­¿ï»ê¾÷´ëÇб³ ´ëÇпø Á¹¾÷(»ê¾÷¾ÈÀü°øÇÐ Àü°ø)

    ÀúÀÚ : ±èº´½Ä
    Àü ÄÉÀ̾ؾ˿£Áö´Ï¾î¸µ ´ëÇ¥, Çö´ë¿£Áö´Ï¾î¸µ(ÁÖ), SK°Ç¼³(ÁÖ) »ó¹« µîÀ¸·Î 36³â ±Ù¹«
    ¿¬¼¼´ëÇб³ ±â°è°øÇаú Á¹¾÷

    ÀúÀÚ : °øÁø¼º
    Çö Sv Plant Engineering Àü¹«, Çö´ë¿£Áö´Ï¾î¸µ(ÁÖ), SK°Ç¼³(ÁÖ) Àü¹®À§¿ø µîÀ¸·Î 36³â ±Ù¹«
    ÀÎÇÏ´ëÇб³ ±â°è°øÇаú Á¹¾÷

    ¸ñÂ÷

    ¸Ó¸®¸» / iii

    01 Introduction of Engineering
    1.1 General 3
    1.2 EPC Business ¼Ò°³ 3
    1.3 EPC Project Execution 8
    1.4 Introduction of Piping Engineering 11

    02 Code & Standard¿¡ ´ëÇÑ ÀÌÇØ¿Í ¿ª»ç
    2.1 General 15
    2.2 Code & Standard »ç¿ë 16
    2.3 ASME Code ¹ßÀü°ú ÇöÀç 17
    2.4 Future Direction of Code È°¿ë 21

    03 Piping Design Role & Responsibility
    3.1 General 31
    3.2 Piping Engineering & Design ¼Ò°³ 31
    3.3 ¹è°ü ¿£Áö´Ï¾îÀÇ ¿ªÇÒ°ú Ã¥ÀÓ(Role and Responsibility) 41
    3.4 Piping Design Input & Output Control 50
    3.5 Piping Groupº° Work Activity 51
    3.6 Piping Engineering ¼º°úÇ°(Deliverables)ÀÇ Á¾·ù 54
    3.7 3D Graphic Software(S/W) 55
    3.8 °è»ê¿ë S/W 55

    04 Plant Layout
    4.1 General 59
    4.2 Plant Layout ±âÃÊ 59
    4.3 Plant Layout Specification 62
    4.4 Plant Layout ¿øÄ¢ 63
    4.5 Plot plan ÀÛ¼º Flow Chart 63
    4.6 Plant Layout ½Ã °í·Á »çÇ× 64
    4.7 Plant Layout °á·Ð 67
    4.8 ±Ù¿øÀû ¾ÈÀü°øÇÐ °³³ä ÀÌÇØ 67
    4.9 Plant Layout Study 72

    05 Piping Drawing
    5.1 General 85
    5.2 Piping Drawing Á¾·ù 85
    5.3 Drawing Issue by Stage 86
    5.4 Piping Drawing(Sample) 87
    5.5 As-Built Drawing 95
    5.6 µµ¸é ÀÌÇØ¿Í È°¿ë 96

    06 Piping System Design
    6.1 General 101
    6.2 Piping System Design 101
    6.3 Utility Piping System Design 102
    6.4 Process Piping System Design 109
    6.5 Process Requirement 130
    6.6 ¹è°ü Áøµ¿¿¡ ´ëÇÑ ÀÌÇØ 133
    6.7 ÁÖ¿ä ¹è°ü ½Ã½ºÅÛ ¹®Á¦ À¯Çü ¹× ´ëÃ¥ 139
    6.8 Piping System Design Studies 147

    07 Piping Material
    7.1 General 153
    7.2 Pipe and Tube 153
    7.3 Fitting & Main Components 167
    7.4 ¹è°ü °ü°æ ¼±Á¤ 183
    7.5 ¹è°ü °øĪ Size & µÎ²² °è»ê 185
    7.6 ¹è°ü ÀÚÀç ¼±Á¤ 189
    7.7 Material Specification 195
    7.8 À¯Áö °ü¸®/ºÎ½Ä 197
    7.9 ¹è°ü Material ¼±Á¤ ¿¹Á¦ 207
    7.10 Paint & Insulation 209

    08 Basic Concept of Piping Stress Analysis
    8.1 General 219
    8.2 ¹è°ü ÀÀ·ÂÇؼ®ÀÇ Á¤ÀÇ 219
    8.3 Àû¿ë ¹üÀ§ 219
    8.4 ¹è°ü ÀÀ·ÂÇؼ®ÀÇ °³³ä 219
    8.5 ¹è°ü ÀÀ·ÂÇؼ®ÀÇ ÁÖ¸ñÀû 235
    8.6 ¹è°ü ÀÀ·ÂÇؼ® ½Ã °í·ÁµÇ¾î¾ß ÇÒ ÇÏÁß 235
    8.7 ¹è°ü ÀÀ·ÂÇؼ®½Ã ÇÊ¿äÇÑ ÀÚ·á 236
    8.8 ¿­ÀÀ·ÂÇؼ®ÀÇ Çʿ伺¿¡ ´ëÇÑ ÆÇ´Ü ±âÁØ 237
    8.9 ¹è°ü ÀÀ·ÂÇؼ® ÀýÂ÷ 240
    8.10 ¹è°ü ÀÀ·Â Æò°¡ ±âÁØ 240
    8.11 ¹è°ü ÀÀ·ÂÇؼ®ÀÇ Æò°¡ 247
    8.12 ¹è°ü ÀÀ·ÂÇؼ® º¸°í¼­ 249
    8.13 ¹è°ü ÀÀ·ÂÇؼ® °ü·Ã CODES 250
    8.14 ¹è°ü ¼³°è Guided Cantilever Beam Method Àû¿ë 250
    8.15 Information Flow for Stress Analysis & Piping Stress Engineering Software 253

    09 Piping Supports
    9.1 General 261
    9.2 Pipe SupportsÀÇ Á¤ÀÇ 261
    9.3 Piping SupportÀÇ ¿ªÇÒ 261
    9.4 Piping Support Material ¼±Á¤ 262
    9.5 Function¿¡ ÀÇÇÑ Type of Support ºÐ·ù ±âÁØ 263
    9.6 Type of Support 264
    9.7 ¿­ÆØâ, ÁöÁø¿¡ »ç¿ëµÇ´Â Special Type Support 269
    9.8 Pipe Supports Code & Standards 271
    9.9 Piping Support SpanÀÇ ÀÌÇØ 272
    9.10 Typical Small Bore(1 1/2\" & Lower) Installations 275

    10 Ethylene Piping System Studies
    10.1 General 281
    10.2 Conceptual Ethylene Process 282
    10.3 Dual Ethylene Process Plant 284
    10.4 Ethylene Large Bore Piping Header Studies 287
    10.5 Large Bore Piping System Consideration(Ethylene Project Case) 321
    10.6 Ethylene Project Special Consideration 327

    11 Project Piping Execution
    11.1 General 357
    11.2 Project Piping Design Execution ÀÌÇØ 357
    11.3 Piping Engineering Work Milestone °ü¸® 359
    11.4 Interface Control 369
    11.5 Key Factor for Success of Piping Engineering Work 371
    11.6 Project Management ¾÷¹« ¹üÀ§ Á¤ÀÇ/Reference Data by PMP 373

    12 Piping Design Closeout Phase
    12.1 General 385
    12.2 Field Engineering 385
    12.3 Lessons & Learned 389
    12.4 Piping Closeout Report 392

    ¹è¼Û ½Ã À¯ÀÇ»çÇ×

    - ¹Ýµð¾Ø·ç´Ï½º¿¡¼­ ±¸¸ÅÇϽŠµµ¼­´Â ¹°·ù ´ëÇà À§Å¹¾÷ü ¿õÁø ºÏ¼¾À» ÅëÇØ ¹è¼ÛµË´Ï´Ù.
     (¹è¼Û Æ÷Àå¿¡ "¿õÁø ºÏ¼¾"À¸·Î Ç¥±âµÉ ¼ö ÀÖ½À´Ï´Ù.)

    - ±¸¸ÅÇÑ »óÇ°ÀÇ Ç°Áú°ú ¹è¼Û °ü·Ã ¹®ÀÇ´Â ¹Ýµð¾Ø·ç´Ï½º·Î ¹®ÀÇ ¹Ù¶ø´Ï´Ù.

    - õÀçÁöº¯ ¹× Åùè»çÀÇ »çÁ¤¿¡ µû¶ó ¹è¼ÛÀÌ Áö¿¬µÉ ¼ö ÀÖ½À´Ï´Ù.

    - °áÁ¦(ÀÔ±Ý) ¿Ï·á ÈÄ ÃâÆÇ»ç ¹× À¯Åë»çÀÇ »çÁ¤À¸·Î Ç°Àý ¶Ç´Â ÀýÆÇ µÇ¾î »óÇ° ±¸ÀÔÀÌ ¾î·Á¿ï ¼ö ÀÖ½À´Ï´Ù. (º°µµ ¾È³» ¿¹Á¤)

    - µµ¼­»ê°£Áö¿ªÀÇ °æ¿ì Ãß°¡ ¹è¼Ûºñ°¡ ¹ß»ýµÉ ¼ö ÀÖ½À´Ï´Ù.

    ¹ÝÇ°/±³È¯

    »óÇ° ¼³¸í¿¡ ¹ÝÇ°/ ±³È¯ °ü·ÃÇÑ ¾È³»°¡ ÀÖ´Â °æ¿ì ±× ³»¿ëÀ» ¿ì¼±À¸·Î ÇÕ´Ï´Ù. (¾÷ü »çÁ¤¿¡ µû¶ó ´Þ¶óÁú ¼ö ÀÖ½À´Ï´Ù)

    ¹ÝÇ°/±³È¯

    ¹ÝÇ°/±³È¯
    ¹ÝÇ°/±³È¯ ¹æ¹ý Ȩ > °í°´¼¾ÅÍ > ÀÚÁÖã´ÂÁú¹® ¡°¹ÝÇ°/±³È¯/ȯºÒ¡± ¾È³» Âü°í ¶Ç´Â 1:1»ó´ã°Ô½ÃÆÇ
    ¹ÝÇ°/±³È¯ °¡´É ±â°£ ¹ÝÇ°,±³È¯Àº ¹è¼Û¿Ï·á ÈÄ 7ÀÏ À̳», »óÇ°ÀÇ °áÇÔ ¹× °è¾à³»¿ë°ú ´Ù¸¦ °æ¿ì ¹®Á¦¹ß°ß ÈÄ 30ÀÏ À̳»¿¡ ½Åû°¡´É
    ¹ÝÇ°/±³È¯ ºñ¿ë º¯½É ȤÀº ±¸¸ÅÂø¿ÀÀÇ °æ¿ì¿¡¸¸ ¹Ý¼Û·á °í°´ ºÎ´ã(º°µµ ÁöÁ¤ Åùè»ç ¾øÀ½)
    ¹ÝÇ°/±³È¯ ºÒ°¡ »çÀ¯
    • ¼ÒºñÀÚÀÇ Ã¥ÀÓ »çÀ¯·Î »óÇ° µîÀÌ ¼Õ½Ç ¶Ç´Â ÈÑ¼ÕµÈ °æ¿ì
    • ¼ÒºñÀÚÀÇ »ç¿ë, Æ÷Àå °³ºÀ¿¡ ÀÇÇØ »óÇ° µîÀÇ °¡Ä¡°¡ ÇöÀúÈ÷ °¨¼ÒÇÑ °æ¿ì
    • º¹Á¦°¡ °¡´ÉÇÑ »óÇ° µîÀÇ Æ÷ÀåÀ» ÈѼÕÇÑ °æ¿ì : ¿¹)¸¸È­Ã¥, ÀâÁö, È­º¸Áý µî
    • ½Ã°£ÀÇ °æ°ú¿¡ ÀÇÇØ ÀçÆǸŰ¡ °ï¶õÇÑ Á¤µµ·Î °¡Ä¡°¡ ÇöÀúÈ÷ °¨¼ÒÇÑ °æ¿ì
    • ÀüÀÚ»ó°Å·¡µî¿¡¼­ÀÇ ¼ÒºñÀÚº¸È£¿¡ °üÇÑ ¹ý·üÀÌ Á¤ÇÏ´Â ¼ÒºñÀÚ Ã»¾àöȸ Á¦ÇÑ ³»¿ë¿¡ ÇØ´çµÇ´Â °æ¿ì
    • ÇØ¿ÜÁÖ¹® »óÇ°(ÇØ¿Ü ¿ø¼­)ÀÇ °æ¿ì(Æĺ»/ÈѼÕ/¿À¹ß¼Û »óÇ°À» Á¦¿Ü)
    ¼ÒºñÀÚ ÇÇÇغ¸»ó
    ȯºÒÁö¿¬¿¡ µû¸¥ ¹è»ó
    • »óÇ°ÀÇ ºÒ·®¿¡ ÀÇÇÑ ¹ÝÇ°, ±³È¯, A/S, ȯºÒ, Ç°Áúº¸Áõ ¹× ÇÇÇغ¸»ó µî¿¡ °üÇÑ »çÇ×Àº
      ¼ÒºñÀÚ ºÐÀïÇØ°á ±âÁØ(°øÁ¤°Å·¡À§¿øȸ°í½Ã)¿¡ ÁØÇÏ¿© 󸮵Ê
    • ´ë±Ý ȯºÒ ¹× ȯºÒÁö¿¬¿¡ µû¸¥ ¹è»ó±Ý Áö±Þ Á¶°Ç, ÀýÂ÷ µîÀº ÀüÀÚ»ó°Å·¡ µî¿¡¼­ÀÇ
      ¼ÒºñÀÚ º¸È£¿¡ °üÇÑ ¹ý·ü¿¡ µû¶ó ó¸®ÇÔ
    ¹ÝÇ°/±³È¯ ÁÖ¼Ò °æ±âµµ ÆÄÁֽà ¹®¹ß·Î 77, ¿õÁøºÏ¼¾(¹Ýµð¾Ø·ç´Ï½º)
    • ȸ»ç¸í : (ÁÖ)¼­¿ï¹®°í
    • ´ëÇ¥ÀÌ»ç : ±èÈ«±¸
    • °³ÀÎÁ¤º¸ º¸È£Ã¥ÀÓÀÚ : ±èÈ«±¸
    • E-mail : bandi_cs@bnl.co.kr
    • ¼ÒÀçÁö : (06168) ¼­¿ï °­³²±¸ »ï¼º·Î 96±æ 6
    • »ç¾÷ÀÚ µî·Ï¹øÈ£ : 120-81-02543
    • Åë½ÅÆǸž÷ ½Å°í¹øÈ£ : Á¦2023-¼­¿ï°­³²-03728È£
    • ¹°·ù¼¾ÅÍ : (10881) °æ±âµµ ÆÄÁֽà ¹®¹ß·Î 77 ¹Ýµð¾Ø·ç´Ï½º
    copyright (c) 2016 BANDI&LUNI'S All Rights Reserved